Draft FY2005 Task Sheets
WBS Task
1 Accelerator Systems
1.1 Instrumentation
1.1.1 Tune Feedback
1.1.2 Luminometer
1.2 Accelerator Physics
1.2.1 Beam Commissioning
1.2.2 Phase I Collimation Studies
1.2.3 Electron Cloud
1.2.4 Interaction Regions and Beam-Beam
1.3 Phase II Collimator R&D
1.4 Hardware Commissioning
2 Magnet R&D
Accelerator System Milestones