The Technical Division develops, designs, fabricates or procures, and
tests accelerator and detector components. Technical Division personnel
not only build the components of the accelerators and detectors of
today and the near future, but also think far in advance, preparing for
the high-energy physics machines and experiments of generations to
come. We are renowned for building the magnets for the Tevatron, the
worlds first and still highest-energy collider.
Recent Technical Division major jobs:
Designed, built and tested over 400 magnets for Fermilab's new Main Injector
Manage the US National Laboratory collaboration working with CERN to build the Large Hadron Collider.
Develop, build and test the superconducting high-gradient quadrupoles for the LHC interaction regions.
Fabricate the end-cap muon chambers for the CMS detector at LHC.